Lane, width restriction on KY 85 Green River Bridge to start Dec. 2nd

In News by OC Monitor Staff

A contractor for the Kentucky Transportation Cabinet plans to place a lane and load width restriction on the KY 85 Green River Bridge at the McLean-Ohio County Line starting Monday, December 2, 2013, according to a news release from the KYTC.
 
This lane and width restriction is to allow joint and deck repair work on the bridge.  Trucks in this work zone will be restricted to a 12 ft. maximum load width.
 
Traffic will be restricted to one lane with alternating flow controlled by an automated signal.  Appropriate caution is required where equipment, flaggers, and construction personnel are on the bridge deck in near to traffic flow.
 
The KY 85 Green River Bridge is at McLean County mile point 12.33 and Ohio County mile point 0.0.
 
T & C Contracting, Inc, is the prime contractor on this $199,764 bridge maintenance and repair project.  The work is expected to be completed by January 15, 2014, weather permitting.
 
About 1300 vehicles cross the KY 85 Green River Bridge in an average day.

Get full access to the Ohio County Monitor and support quality local journalism with a $2.99 monthly subscription, which is now discounted 40%! That's only 10 cents per day! Or log in to read the rest of this content.