MADISONVILLE, Ky. — Motorists traveling with wide loads on the Western Kentucky Parkway can anticipate 11-foot lanes for both directions beginning on Monday, April 6. The lane restrictions are necessary for bridge rehabilitation between Lewis Creek Bridge, at the 69.7 mm, and KY 369/Prentiss Road, at the 72.4 mm.

